Water Storage in Yakima Basin: The Yakima Water System reports that all reservoirs ate at 85% capacity. Storage is at 117% of average. Snow water estimates in the upper basin is 107% and in the lower basin is at 104%.

 

Draft Kachess & Keechelus EIS Information: The Kachess Drought Relief Pumping Plant and Keechelus Reservoir-to-Kachess Reservoir Conveyance Supplemental Draft Environmental Impact Statement was published April 2018. The estimated cost of the Kachess Drought Relief Pumping Plant is

Cost Categories KDRPP Floating Pumping Plant (Alt. 4)*
Field cost 150,000,000
Noncontract cost   45,000,000
   Subtotal:construction cots 195,000,000
   Interest during construction    7,000,000
Operations and maintenance cost (100 years)   25,000,000
Power costs (100 years)    5,000,000
Replacement cost (100 years)   50,000,000
Subtotal: OMR&P 80,000,000
Total 282,000,000

*Reclamation and Ecology 2016

 

The estimated cost of the Keechelus-to-Kachess Reservoir Conveyance is

Cost Categories KKC North Tunnel Alignment*
Field cost 206,413,000
Noncontract cost   34,400,000
   Subtotal: construction cost 240,813,000
   Interest during construction 12,421,000
Operations and maintenance cost (100 years)    4,031,000
Power costs (100 years)        257,000
Replacement cost (100 years)        734,000
Subtotal: OMR&P    5,022,000
Total 258,256,000

*Reclamation and Ecology 2016

 

Online Supplemental Draft Environmental Impact Statement: For a copy of the SDEIS go to http://www.usbr.gov/pn/programs/eis/kdrpp/index.html and http://www.usbr.gov/pn/programs/eis/kkc/index.html.

 

Supplemental Draft Environmental Impact Statement Comments: Comment orally, electronically, or by regular mail on the Supplemental Draft Environmental Impact Statement. Oral comments will be accepted at both public meetings listed below. The meetings will be from 4-7 pm on the dates and locations listed below.

  • May 16, 2018, U.S. Forest Service, Cle Elum Ranger Distict, 803 W. 2nd St., Cle Elum, WA 98922.
  • May 17, 2018, The Armory, Kittitas Valley Event Center, 901 E. 7th Ave., Ellensburg, WA 98926.

 

Go to www.ybsa.org for additional information.